Context
Business intelligence redesign project
Challenge
Study a possible architecture with SAP HANA to replace the datawarehouse under MSSQL 2005 while keeping the data model, the ETL Datastage interface heritage and Cognos reports.
Technologies used
DBMS: SAP HANA 1.0 SPS12 Full Use • ETL: IBM Infosphere Datastage PX 9.1 • Reporting: IBM Cognos V10.2 On Premise • Dataviz: Tableau Server 10.3 • Cloud AWS
Methodology and implementation
This ambitious project aimed to modernize the business intelligence infrastructure by migrating to SAP HANA while preserving existing investments.
The target architecture had to meet several constraints: - Coexistence with existing SAP BW instances - Progressive migration without service interruption - Performance optimization compared to the old MSSQL 2005 system - Replacement of Cognos with Tableau Server on AWS for reporting
The POC validated the technical feasibility and measured performance gains.
Results
POC completed: SAP HANA On Premise co-located on SAP BW instances with license extension. Integration driven by Datastage as scheduler and HANA stored procedures to take advantage of database performance for data loading. Tableau Server 10.2 on AWS was chosen for reporting to replace Cognos.
Visualizations

HANA and Tableau product architecture

SAP HANA FlowGraph with APL forecast function

Tableau on HANA parameter prompts

Revenue forecast with Tableau on HANA

Parameters vs filters performance comparison in HANA